mene containers
Official Assembly Guidelines

mene containers Assembly & Delivery Guide

Professional on-site assembly from £350, strict site access clearance requirements, and flexible delivery assistance across the UK.

2 Sides Accessible Required
Assembly from £350 (+VAT)
Kerbside Tail-Lift Delivery
Driver Assistance / Fitting Fee £100
Critical Construction Prerequisite

Site Access & Clearance Requirement

"Assembly of ALL units must have at least two sides accessible to construct the unit. One long side and one short side. If there’s only one side available, we can’t construct."

Approved for Construction
CONTAINER UNIT One Long Side Accessible One Short Side Accessible

Two Sides Accessible

Our 2–4 technician crew requires full physical clearance along at least one long side and one short side. This provides the minimum safety perimeter required to raise wall panels, secure corner posts, and torque exterior fastening bolts.

  • Safe Panel Positioning: Crew can maneuver side & end panels freely
  • Bolt Fastening: Direct access to corner uprights & roof channels
  • Weatherproof Seal: Perimeter flashing securely torqued
Cannot Construct
CONTAINER UNIT Wall / Fence (Blocked) Only 1 Side Accessible

Only One Side Available

If a unit is positioned tightly between two walls, fences, or adjacent structures with only the front or a single side open, construction cannot take place. Our fitters cannot physically access the side channels or safely drop the roof assembly.

  • Zero Perimeter Clearance: Wall panels cannot be aligned from outside
  • Assembly Failure: Technicians cannot insert socket bolts
  • Safety Hazard: Team cannot safely support roof & steel corners
Transparent Pricing Schedule

Assembly & Construction Charges

Fixed transparent rates categorized by unit series, panel weight, crew size, and equipment requirements.

Insulated Storage

Thermal insulated condensation-free stores

  • 2x3 Insulated £375 +VAT
  • 2x4 Insulated £500 +VAT
2x3 is a 3-person job; 2x4 is a 4-person job due to panel weight.

Modular Office

Insulated office units with glazed fixtures

  • 2x6 Office (With Forklift) £750 +VAT
  • 2x6 Office (Manual Handling) £1,000 +VAT
4-person job. Forklift on site saves £250 in manual labor.

Chemical Storage (COSHH)

Hazardous stores with bunded sump flooring

  • 2x3 & 2x4 (With Forklift) £350 +VAT
  • 2x3 & 2x4 (No Forklift) £500 +VAT
2-person with forklift; 4-person crew required without forklift.

Insulated Chemical

Bunded & thermal insulated chemical storage

  • 2x3 & 2x4 Insulated £500 +VAT
Heavy-duty 4-person crew required for insulated sump assembly.
Delivery & Unloading Protocol

Kerbside Delivery & Driver Assistance Notice

Usually speaking we quote for kerb side delivery. On many jobs our logistics team have had to carry the container components from the front of the property to the back, through challenging and narrow access points.

If you are self-assembling and there is no able-bodied person on site to help assist the driver with unloading the container, we can dispatch an extra assistant (fitting fee) for £100.

£100
Extra Delivery Assistant (+VAT)
Need Clarity?

Assembly & Delivery FAQs

mene flat pack containers interlock via outer vertical corner channels and roof gutters. Technicians must stand outside the perimeter on both a long and short side to guide the steel panels into place and torque down the security bolts. If a unit is jammed in a corner against 3 walls, the roof and side panels cannot be physically fastened.

Yes, absolutely! All mene containers are designed for rapid DIY assembly. Standard units (2m–4m) typically take 2 people roughly 30 to 45 minutes using standard 13mm and 19mm socket wrenches. No specialized tools or welding required.

Standard delivery is kerbside via tail-lift. The driver operates the tail-lift and pallet truck, but individual steel panels require two people to carry safely. If you are self-assembling and will not have an able-bodied person on site at the delivery window, booking an extra man for £100 ensures two people are present to offload the panels safely.

You must provide a firm, level surface (concrete slab, tarmac, paving stones, or railway sleepers). If the ground is uneven, the doors will not align smoothly. Ensure the walkway from the parking area to the assembly point is clear of debris, steps, and low-hanging wires.

UK Nationwide Service

Need Assembly Booked for Your Site?

Speak directly with our logistics coordinators to confirm site clearance and add professional assembly to your delivery.